Compare repair and replacement
Review recurring faults, comfort complaints and the expected use of the building. A system serving a changed floor plan or higher occupancy may need a different approach from a like-for-like replacement.
- Existing equipment and distribution assessment
- Capacity and control requirements
- Electrical, drainage and installation considerations
- Access, scheduling and potential downtime
Define the project before scheduling
The proposal should identify included equipment and installation work, any needed building coordination and responsibilities for related work. Site requirements are confirmed during assessment.
Final equipment selection, price and timing depend on the property and product availability. A site visit is needed before committing to a replacement scope.